Faq

Are you a licensed contractor?

Yes

How far up the walls do you waterproof?

Usually 100mm around perimeter of room in wet areas. If full walls are required in shower area usually 2 meters high.

What is the time frame for your product to cure?

Usually there is a 24hr drying period but on Decks and Patios two (2) days after final application.

When do we receive our certificates?

Certificate's will be mailed out when the final payment has been received by Absolute Waterproofing.

Can we give you a faxed or email rough drawing of our job?

Yes please email us as much details as you have as it will give you a more accurate price in your quote.

Should the shower screen be set on inside of hob?

Yes

Do we need to put tile underlay on timber flooring?

Yes

Should we put flashing around walls on top of decks where waterproofing is required?

Yes

Is it advisable to waterproof a retaining wall prior to backfilling?

Yes

When preparing retaining walls, how much space do you need to have to get behind the wall for you to waterproof?

If you can get behind the wall with ease then that is substantial enough for us to get behind and waterproof.

Do we need to remove even our shower screen from the shower?

Yes it is advised that you do this, as it makes it easier for us to waterproof.

Scroll to Top